- Steel Round Bars[6]
- Flat Steel[6]
- Steel Sheets[6]
- Bearing Steel[1]
- Contact Person : Mr. H Steven
- Company Name : Dongguan Bo Yunte Metal Co., Ltd.
- Tel : 86-769-85336098
- Fax : 86-769-85320536
- Address : Guangdong,Dongguan,#3,Rongfeng Rd, the 3rd Industrial Zone of Shangsha, Chang'an Town, Dongguan City
- Country/Region : China
- Zip : 523869
Related Product Searches:Forged 1.2080 Cold Work Tool Steel,High Quality 1.2080 Cold Work Tool Steel,1.2080 Cold Work Tool Steel D3/SKD1/1.2080/BD3/Cr12
Forged 1.2080 Cold Work Tool Steel
General Information:
Steel with wear resistance and fairly good dimensional stability during heat treatment. Rolls for cold strip mills and wire squeezer mills, circular knives and shear blades, dies for small metal parts, punches and drawing dies, dies for sintering, forming tool rollers, shear blades, molds for plastic materials.
Comparable Standards:
AISI/SAE | DIN | W.Nr. | AFNOR | JIS | BS | SIAU | GB,YB |
D3 | X210Cr12 | 1.2080 | Z200C12 | SKD1 | D3 | K12 | - |
Chemical Analysis (%):
C | Mn | Si | Cr | V | Mo | P | S |
1.90-2.20 | 0.15-0.45 | 0.10-0.40 | 11.0-12.0 | - | - | ≤0.03 | ≤0.03 |
Heat treatment
Isothermal annealing:
- Heat to 850°Chold for 1/2 hour to 1 hour;
- Furnace cooling to 770°C and hold at temperature for at least 10 hours;
- Cool by 10°C /h to 720°C;
- Cooling in air.
Stress relieving:
To be carried out after machining and before the final heat treatment.
- Heat to 650-700°C, hold for 4/6 hours:
- Furnace cooling to 330-350°C;
- Cooling in air.
Hardening:
- Initial preheating to 350-450°C;
- Second preheating to 750-850°Cin salt bath at 850°C;
- Austenitizing at 960-100°C;
- Cooling in fluid oil.
Quenched hardness: 64-65 HRC
---------------------------------------------------------------------------------------------------------------------------------
Production Equipments
Steel Producing Process
Smelting
Forging Facility
Heat Treatment
Inspection
Cutting Facility (Band Saw Machines)
Container Loading